Sunday, January 6, 2008

The LoCoRR, Lower Level, Smaller Scale


Tearing up the N-scale tracks got me thinking about the second, unused level of the bench work, and now that I had the knack of putting it together I knew it would take just an afternoon or two to get it fixed up.

This is the result of two afternoons of cutting and gluing. I still have to cut a piece of hardboard to cover the second half. I'll do the same with the lower level off to the right eventually, but this will do for now, just to get things started.