Sunday, March 14, 2010

Back to work!


The track gang has been at work again!

Trains leaving the platform would have to negotiate a tight S-turn (to the right, behind the pail of spackle) that's been torn up in favor of re-routing the exit track to the left around a much more train-friendly thirty-six inch curve.

To lay track along the broader curve, the gang filled the gaps between the old roadbeds with plenty of spackle. When it's try, the new track will be laid around the broader curve to meet up with the road bed in the foreground, about two inches from the edge of the table top.