Wednesday, March 26, 2008

May I See Your Pass?



Trouble on the LoCo RR yesterday when the chief engineer's private car tried to squeak past a two-car limited waiting on the other track.

It seems the track gang wasn't paying close enough attention to the specs when they surveyed this portion of of the road and, as a result, laid the two tracks a tad bit close to one another. There is every reason to believe that alcohol might have been involved.

A board convened to look into the matter, but in the meantime the corner of the baggage car will have to be carefully pried away from the chief engineer's car, which in turn will spend the weekend in the body & paint shop at nearby Dogwater Flowage. The chief engineer is anything but happy as he and some of the boys were going to watch the game on the big flat-screen he recently installed in the car's spacious parlor.

He's a teensy bit irked about the track geometry, too, and has already begun plans to tear up this corner and tighten the bend just enough to open up the clearance between cars. The stretch of track should be open again by Monday morning.

Sunday, March 16, 2008

On the road again



I finally bagged a couple of #5 switches in an e-bay auction. They're a lot harder to find that I would have thought. Lots of people post #4's and #6's but hardly ever a #5. For all the time I've put into waiting for one, I probably would've come out ahead just buying it new.

The #5 came in the mail last week, so this is the first weekend I've had a whole afternoon to myself to plot the geometries needed to make the turnoff into the commissary yards in the foreground.

I carefully pinned down the cork roadbed to use as a guide, traced it with a china marker, then spread caulk adhesive in the outlines with a putty knife. The caulk has a high enough tack to hold the cork in place without making me pin it again.

Besides laying out the commissary yards I ran the other end of the roadbed a little further toward the future site of the terminal.

Sunday, February 3, 2008

On the Bench


It's built mostly of scraps, but it's beginning to look a little like the hobby bench I've pictured in my mind's eye when I started almost two years ago.

I had enough scrap wood to extend the table top and found a bit of peg board in the back of the work shop that was just the right size. After a trip to the hardware store this afternoon I'll be able to hang some tools up and finally clear away some of the clutter on the bench top.

Sunday, January 20, 2008

Paving the road

Another payday, another box of ceiling tiles to lay over the hardboard on top of the benchwork.


Now I can concentrate on purchases of track, switches and roadbed.

Sunday, January 6, 2008

The LoCoRR, Lower Level, Smaller Scale


Tearing up the N-scale tracks got me thinking about the second, unused level of the bench work, and now that I had the knack of putting it together I knew it would take just an afternoon or two to get it fixed up.

This is the result of two afternoons of cutting and gluing. I still have to cut a piece of hardboard to cover the second half. I'll do the same with the lower level off to the right eventually, but this will do for now, just to get things started.

Saturday, January 5, 2008

Now you see it ...

Today I did a bit of untracklaying.

This N-scale layout, the beginnings of an earlier version of the Lost Continent Railway, will disappear and a hardboard sub-floor will take its place:


Voila! The LoCo's Grand Central Hauptbahnhof will materialize here eventually.

Thursday, December 27, 2007

Bridgebuilding continues

The kludge goes on as I bridge the gap between the two-foot extension (in the background) and the original bench work (in the extreme foreground).


The approach is straightforward and, for once, no screws or power drills have been used. All the pieces are glued into place.

Wednesday, December 26, 2007

A Boxing Day Update

One of the steamers poses for a photo on newly-laid track.

Clearances are a bit close, but still the long passengers cars manage to slip past one another.

Today's impulse bade me work on the long-overdue bridge so the yard throat can cross to the main bench. Track will come round the curve on the extension along the wall to the bench in the foreground where the as-yet notional terminal will be built.


The bridge is a kludge like the rest of the bench work, but it's turned out okay in spite of my questionable abilities as a carpenter.

Sunday, December 23, 2007

Laying Track on the LoCo

I still use carpenter's glue to fix the tracks to the roadbed ...

... and utilize the most high-tech methods at my disposal to spread it evenly, ensuring a high tack and consistent adhesion.

Track fixed to the roadbed and pinned into 24" S-curves, the approach to the yard throat and the station.

Back On Track


After a lapse of about nine weeks, for no reason other than I was pursuing other interests, I found myself with a few hours alone in the basement and satisfied the urge, which came out of nowhere, to lay down some cork roadbed and, just maybe, if I have enough time today, some track, too, although I don't want to get ahead of myself at this point.

I've always used white glue as an adhesive to fasted the roadbed before this but today I used an adhesive caulk, mostly because it was handy but also because I'd read that it was better than white glue. And it is, inasmuch as it's got enough tack to hold the cork in place that I don't have to pin it, although I did pin the ends to keep them bent around the curves.

Sunday, October 14, 2007

I'm so tiled


I topped off the bench work with a layer of medium-density board, and covered it with a layer of acoustic tiles. If this doesn't make for a quiet-running layout, screw it. At this point, I'm committed to laying track.

I spray-painted the tiles with some red primer (Number Two Son says it's pink; whatever) because they were so white it hurt my eyes. I wanted some kind of undercoat to make landscaping easier. The cap on the spray can looked like a dirty brown and it was cheap. So it's a salmon color. Oh, well.

I fixed the tiles to the MDB with a tube of latex adhesive caulk. There was just enough in the one tube to lay it on thick. After the tiles were all laid down, I spackled the joints to leave a more-or-less level surface, then walked away for the rest of the day to let it dry.

Later in the day, I finally won an e-bay auction for a Shinohara double crossover after stalking the auctions for three weeks. With any luck at all I'll be laying track before next weekend.

Sunday, September 30, 2007

Nap Time


Foam pulled up.

Stingers knocked out, re-installed at a height more conducive to straight and level running.

Hardboard and ceiling tiles fetched from hardware store.

One more sheet of hardboard fetched from hardware store because you can't go there just once and expect to get everything.

Ceiling tile pieced together experimentally, cut to fit special locations, set in place (nothing glued down yet -- got to think about this a bit).

I need rest.

Fixer-Upper

The resale on this chunk of benchwork is effectively nil, due in large part to the fact that I change my mind about the layout more often than I change my underwear, the result of which is that it's as irregular as a three-dollar bill.

Just for example, the leg of the benchwork that I refer to as the "three-foot extension" is in fact thirty-seven and three-quarters inches wide. Try to find a piece of stock hardboard to fit that. The layout's been through so many permutations that I have no idea anymore how it ended up this wide.


Here's another excellent example: It may not be obvious from this photo, but when you eyeball it face-to-face, as it were, you can plainly see that the stringers supporting the foam board on the left are obviously higher than the stringers on the right. They are, in fact, almost three-quarters of an inch higher.

I know how I did that, but I'm too embarrassed to explain it right now.

Today's project: Begin to fix these screw-ups. There's no way I can adjust the width of the three-foot extension now, but I can pull out and lower the stringers, which I'll have to do to execute my next fix: Replacing the foam board top.

An article in Model Railroader led me to believe I could lay track directly on the foam board, which could be laid directly on the bench work. Which is factually true: I really could very easily do that, but when I ran a couple locomotives across the track to see them go, every one of them made enough noise to stampede a herd of longhorns. It damn near stampeded me.

So I'm going to put an old-fashioned layer of hardboard across the stringers and an old-fashioned layer of ceiling tiles over that, then lay track on a cork road bed, just as I should have done from the beginning.

Sunday, September 23, 2007

Missing Man


The hobby bench has been dark this past week. I've been a little under the weather.

Saturday, September 15, 2007

A Painting Primer

To give the first coat of cream a bit more strength, I thought I'd try a primer coat of white, applied around the windows of this coach. The results below: one coat on the right, two in the middle, three on the left. I honestly couldn't tell you if the game was worth the candle.

Here's one weird thing about painting this particular coach: I ran across a patch of plastic where the acrylic paint turned instantly to sludge as I applied it, making a smooth, even coat impossible. I scraped it off and tried again with the same result. I've never seen a reaction like this, but then I've never used acrylic paints on plastic models before.

Sunday, September 9, 2007

Given the slip, part 2

Taking a deep breath, I fluxed the first two or three ties, held the outside rail down with a probe and soldered it in place. A quick poke with the probe confirmed it was held fast, and I could see it wasn't a cold joint. Flush with success, I pressed on. Flux, solder repeat.


I filed useless angles into the ends of three rails freehand before I got the idea to cut a jig to hold the rail an the correct angle. All I have to do is concentrate on holding the file straight.

My first frog.


The soldering work is more than a little messy because I've never seen this done before and am working out the kinks as I go.

For instance, I knew that the two kinds of solder I had in my tool box melted at different temperatures, but I had no idea why that was significant until I tried to carry a bead of solder to the rail while the iron was too hot for it. The low-temp solder falls off a hot iron; the high-temp solder sticks to it like cookie crumbs to a toddler's face. And I figured that out how? I grabbed the high-temp solder by mistake.

Saturday, September 8, 2007

Given the slip, part 1

About seven or eight years ago, I bought a kit from a vendor at a train show for a double-slip switch, and it's rattled around in the bottom of a tool box ever since. This week, I finally get around to giving it a shot.

The ties are made of PCB strip that must be cut to length, which I marked with a chisel. The kit was made by Scaleway, a UK company, but the template is downloaded from the Fast Tracks web site.

Then on to the tedious job of hacking all those ties up. An easily-made cutting board with a fence gave me a stable work surface that held the PCB so I could saw through it in one stroke, speeding the task up quite a bit.

Once all the ties are cut, I smeared the template, protected by a layer of packing tape, with white glue and pressed the ties into place.

... then set it aside to let it dry.

Next: Cutting and filing the rails.

Friday, September 7, 2007

Tim Warris' Bronx Terminal

Tim Warris is modeling the Bronx Terminal. I ran across his web page while I was searching for tips and how-to's on laying track by soldering them to PCB ties, a technique I'm trying to earn. Warris is using the same technique to model the terminal's intricate track plan, and he started with what looks like the most insanely complicated triple-lapped turnout ever conceived. He even modeled it in N-scale just for display!

If you go, be sure to click on the link to take you to the earliest post. You won't be disappointed.

Wednesday, September 5, 2007

Putting My College Education to Work


Yours truly holds a bachelor's degree in the liberal arts, and of the electives I took to earn that sheepskin, several involved dirtying card paper with acrylic paint.

Now, decades later, I was faced with the problem: How do I paint the roof of this RPO when the commercially-produced Tamiya paint I bought for the job sucks? (It really does. Don't waste your money.)

As it happened, my tool box held several tubes of acrylic paint I bought from an art shop to paint some signs, probably for a garage sale, and there was still more than enough Mars black to see if I could still remember how to mix paint with water.

You know what? This stuff is leagues better than bottled paint, and a teensy dab goes a long, long way. Fussing with getting the right mix of paint to water is hardly any trouble at all, and even rewarding when it comes out just exactly right.

Of course, it's pretty easy for me to brag when I'm using black straight out of the tube. I'd probably be a frustrated wreck sucking on a bottle of grain alcohol in a dark corner if I'd tried to mix maroon on my quaint little tea saucer.

It's my first baby step.

Sunday, September 2, 2007


Switches are a perfect example of how I suck at track planning.

I drew the curve, then the tangent, and measured the divergent angle. It's a #6 turnout. If I place my Shinohara #6 turnout over the sketch with the frog at the tangent point, it looks like it ought to be a number six. But if I connect the flex track to the switch and try to make it fit, there's no way.

I haven't the slightest idea how to figure out what number switch I'll need without physically owning the switch, connecting it to flex track, and laying it on the bench. Then, and only then, will I have a solid idea what number I'll need to make everything fit. It's the Lionel method of track planning: Piece it together until you find what works.