Saturday, April 26, 2008


Today the chief engineer was scheduled to oversee some tracklaying, but something else caught his eye: an observation car at a bargain price! Just the kind of rolling stock the chief had in mind for his personal business car.

Almost none of the passenger cars on the LoCo have interiors because they're nearly all bargain-shelf Athearn models -- not that there's anything wrong with them. On the contrary, at the prices commanded by commercially-available finished models, there wouldn't be but a tiny handful of rolling stock on the roster if it weren't for the bare-bones models from Athearn, which the management of the Lost Continent Railway finds perfectly presentable.

The body shop at Dog Water Flowage is still under repair after its nearly total destruction in a conflagration triggered by a short in the heating element of an unauthorized distillery hidden under the floorboards, so the chief engineer began to assemble the car on his own, normally a very quick and easy task of screwing the wheel trucks to the floor, then the weights. Windows snap into the openings and a few extra bits of detail like the brake wheel and the railing around the observation platform would finish the car in just a few minutes.

But the head end of the car has no bulkhead for the vestibule, so the chief cut one from a piece of .020 polystyrene using the rear bulkhead as a pattern, carefully tracing the windows for a doorway and cementing it to the sides with some scrap styrene strip.

"That was pretty easy," the chief thought, wondering how long it would take to add a couple rooms and a side passage. The trick, he realized after eyeballing the job, was that the sides and roof of Athearn cars are cast as a shell that clips over the floor. It would be much easier if the roof came off. How difficult could that be?

Only one way to find out.

I started the job of trying to cut the roof off by carefully scoring just under the rivet line with an X-acto knife. After about five passes I began to understand why modelers go straight for their Dremel tools when they start a kit bash like this one.

Still, I was hesitant because I knew a cut-off wheel would melt the plastic even at the Dremel's slowest speed, so I practiced a bit by cutting the roof off an old Tyco caboose, and the results were promising enough to let me dare to move on to the observation car.

It's nearly impossible to make a straight cut, and the burr of melted plastic makes the cut look like hell, but I took my time, kept at it, and found it doesn't turn out nearly as bad as it first looks once the burr is carefully scraped away.

Cutting with the Dremel tool revealed what the X-acto knife only began to hint at: These models are made with plastic so thick it could deflect bullets! Battleships don't have armor plating this thick! Even after going all the way around the roof with the Dremel's cut-off wheel I had to use a utility knife to finish cutting through the thickest parts of the plastic.

With the roof finally sawn off, the job of building up the interior begins to look much more conceivable than before.

Before I begin on the interior, however, there's just a little more work with the Dremel tool to do: I'll have to saw off the head end of the car so I can lay the sides out flat on the work bench. That way I can square off the upper edges of the sides so the roof will sit flat on them.

After the sides are squared off, I can glue the bulkheads again, then glue the whole kit and kaboodle to the floor

Sunday, April 13, 2008

Spotting cars



The track gangs have finished laying two more switches in the terminal yard of the grand central station yet to be named.

As a test of their proficiency, the chief engineer has spent the afternoon spotting a few spare cars on the spurs. He declared the ride through the switches to be so smooth that the first round of drinks at the Thirsty Camel are on him.

His announcement was met with three cheers, and the track gang carried him off on their shoulders, leaving these cars littering the yards.

More of the track gang's handiwork; these three spurs will serve the commissary yards at Hollow Leg. There's a nasty kink in the outside curve at the far left that the chief engineer hasn't found yet, and Dominic Fraboni, boss of the track gang, aims to keep him ignorant of it.

Compare this photo with a shot of the same ground back in December. The work is coming along slowly, but it's coming along just the same.

Gone Round The Bend



The chief engineer takes a two-car special for a spin around a newly-completed stretch of track along the main line up to the terminal throat. The crossover switches haven't been wired for operation yet, so he backs the special through the s-turn and stops for the photographer.


Payday! And the chief engineer had some money left over for track and roadbed, so tracklaying into the terminal yard continued this weekend with the inbound main track and two spurs graded past the switches.

Here, the track laying gang uses a row of books to hold a switch in place while the glue dries.

Monday, March 31, 2008

Bringing the cars in




By Sunday night the grade leading through the terminal throat, and to the switches along the south side of the terminal yard, had been leveled and made ready for track.












"There's no frigate like a book to take us lands away ..." A row of heavy, hard-backed books holds track in place as the glue dries. Standing them up allows air to circulate and the glue to set more quickly.











The track gangs have finished laying the switches into the southern terminal yard and a pair of cars, one standard diner and a heavyweight baggage, are used to find the hairy spots through the crossover.

Sunday, March 30, 2008

Tracking progress



The LoCo track gangs have been hard at work through the weekend preparing the grade for these switches that will bring traffic in to the road's Central Terminal.

With the road bed laid and the right of way readied, only the track is needed. Unfortunately the chief engineer has run up against a shortage, so the track gangs may be shifted to routine maintenance on another stretch of the line.




Using the T.L.A.R. method to line up switches.

(That Looks About Right)

Wednesday, March 26, 2008

May I See Your Pass?



Trouble on the LoCo RR yesterday when the chief engineer's private car tried to squeak past a two-car limited waiting on the other track.

It seems the track gang wasn't paying close enough attention to the specs when they surveyed this portion of of the road and, as a result, laid the two tracks a tad bit close to one another. There is every reason to believe that alcohol might have been involved.

A board convened to look into the matter, but in the meantime the corner of the baggage car will have to be carefully pried away from the chief engineer's car, which in turn will spend the weekend in the body & paint shop at nearby Dogwater Flowage. The chief engineer is anything but happy as he and some of the boys were going to watch the game on the big flat-screen he recently installed in the car's spacious parlor.

He's a teensy bit irked about the track geometry, too, and has already begun plans to tear up this corner and tighten the bend just enough to open up the clearance between cars. The stretch of track should be open again by Monday morning.

Sunday, March 16, 2008

On the road again



I finally bagged a couple of #5 switches in an e-bay auction. They're a lot harder to find that I would have thought. Lots of people post #4's and #6's but hardly ever a #5. For all the time I've put into waiting for one, I probably would've come out ahead just buying it new.

The #5 came in the mail last week, so this is the first weekend I've had a whole afternoon to myself to plot the geometries needed to make the turnoff into the commissary yards in the foreground.

I carefully pinned down the cork roadbed to use as a guide, traced it with a china marker, then spread caulk adhesive in the outlines with a putty knife. The caulk has a high enough tack to hold the cork in place without making me pin it again.

Besides laying out the commissary yards I ran the other end of the roadbed a little further toward the future site of the terminal.

Sunday, February 3, 2008

On the Bench


It's built mostly of scraps, but it's beginning to look a little like the hobby bench I've pictured in my mind's eye when I started almost two years ago.

I had enough scrap wood to extend the table top and found a bit of peg board in the back of the work shop that was just the right size. After a trip to the hardware store this afternoon I'll be able to hang some tools up and finally clear away some of the clutter on the bench top.

Sunday, January 20, 2008

Paving the road

Another payday, another box of ceiling tiles to lay over the hardboard on top of the benchwork.


Now I can concentrate on purchases of track, switches and roadbed.

Sunday, January 6, 2008

The LoCoRR, Lower Level, Smaller Scale


Tearing up the N-scale tracks got me thinking about the second, unused level of the bench work, and now that I had the knack of putting it together I knew it would take just an afternoon or two to get it fixed up.

This is the result of two afternoons of cutting and gluing. I still have to cut a piece of hardboard to cover the second half. I'll do the same with the lower level off to the right eventually, but this will do for now, just to get things started.

Saturday, January 5, 2008

Now you see it ...

Today I did a bit of untracklaying.

This N-scale layout, the beginnings of an earlier version of the Lost Continent Railway, will disappear and a hardboard sub-floor will take its place:


Voila! The LoCo's Grand Central Hauptbahnhof will materialize here eventually.

Thursday, December 27, 2007

Bridgebuilding continues

The kludge goes on as I bridge the gap between the two-foot extension (in the background) and the original bench work (in the extreme foreground).


The approach is straightforward and, for once, no screws or power drills have been used. All the pieces are glued into place.

Wednesday, December 26, 2007

A Boxing Day Update

One of the steamers poses for a photo on newly-laid track.

Clearances are a bit close, but still the long passengers cars manage to slip past one another.

Today's impulse bade me work on the long-overdue bridge so the yard throat can cross to the main bench. Track will come round the curve on the extension along the wall to the bench in the foreground where the as-yet notional terminal will be built.


The bridge is a kludge like the rest of the bench work, but it's turned out okay in spite of my questionable abilities as a carpenter.

Sunday, December 23, 2007

Laying Track on the LoCo

I still use carpenter's glue to fix the tracks to the roadbed ...

... and utilize the most high-tech methods at my disposal to spread it evenly, ensuring a high tack and consistent adhesion.

Track fixed to the roadbed and pinned into 24" S-curves, the approach to the yard throat and the station.

Back On Track


After a lapse of about nine weeks, for no reason other than I was pursuing other interests, I found myself with a few hours alone in the basement and satisfied the urge, which came out of nowhere, to lay down some cork roadbed and, just maybe, if I have enough time today, some track, too, although I don't want to get ahead of myself at this point.

I've always used white glue as an adhesive to fasted the roadbed before this but today I used an adhesive caulk, mostly because it was handy but also because I'd read that it was better than white glue. And it is, inasmuch as it's got enough tack to hold the cork in place that I don't have to pin it, although I did pin the ends to keep them bent around the curves.

Sunday, October 14, 2007

I'm so tiled


I topped off the bench work with a layer of medium-density board, and covered it with a layer of acoustic tiles. If this doesn't make for a quiet-running layout, screw it. At this point, I'm committed to laying track.

I spray-painted the tiles with some red primer (Number Two Son says it's pink; whatever) because they were so white it hurt my eyes. I wanted some kind of undercoat to make landscaping easier. The cap on the spray can looked like a dirty brown and it was cheap. So it's a salmon color. Oh, well.

I fixed the tiles to the MDB with a tube of latex adhesive caulk. There was just enough in the one tube to lay it on thick. After the tiles were all laid down, I spackled the joints to leave a more-or-less level surface, then walked away for the rest of the day to let it dry.

Later in the day, I finally won an e-bay auction for a Shinohara double crossover after stalking the auctions for three weeks. With any luck at all I'll be laying track before next weekend.

Sunday, September 30, 2007

Nap Time


Foam pulled up.

Stingers knocked out, re-installed at a height more conducive to straight and level running.

Hardboard and ceiling tiles fetched from hardware store.

One more sheet of hardboard fetched from hardware store because you can't go there just once and expect to get everything.

Ceiling tile pieced together experimentally, cut to fit special locations, set in place (nothing glued down yet -- got to think about this a bit).

I need rest.